OVERVIEW
The college of St. Scholastica has built a new student center in the heart of campus, and we are proud to have been a part of this project that has transformed the campus infrastructure.
The team at Northland completed a full civil package on this project, including excavation, grading, utilities, storm sewer, blacktop paving, and a complex temporary shoring wall. This project was another showcase of the full-service capabilities offered by Northland.
![](https://northlandconstructors.com/wp-content/uploads/2023/09/DJI_0664-small-scaled.jpg)
![](https://northlandconstructors.com/wp-content/uploads/2023/09/DJI_0672-small-scaled.jpg)
![](https://northlandconstructors.com/wp-content/uploads/2023/09/DJI_0668-small-scaled.jpg)
![](https://northlandconstructors.com/wp-content/uploads/2023/09/DJI_0666-small-scaled.jpg)
![](https://northlandconstructors.com/wp-content/uploads/2023/09/DJI_0664-small-scaled.jpg)
INDUSTRIES
![](https://northlandconstructors.com/wp-content/uploads/2023/01/004-shop-100-brown.png)